A maximum of 4 activities can be defined per day. This can be explained by the current limitation of the graphic component for the yearly/monthly planning used to follow the provisional planning of a resource (refer to the HOR sizing activity code)
Refer to documentation Implementation
This function is sub-divided into a header and 2 tabs.
Presentation
At header level, in addition to the code of the prototype week and its description, the number of hours totaled for the activities of the prototype week can be found.
Close
Fields
The following fields are present on this tab :
| Specifies the prototype week code. |
|   |
| Specifies the number of worked hours during the prototype week. |
|   |
Close
Presentation
This tab is used to define the work days of the prototype week.
A work day is characterized by:
Close
Fields
The following fields are present on this tab :
|   |
|   |
|   |
Close
Presentation
This tab is used to define the activity planning for each day of the prototype week.
For each day, the maximum number of time slots which can be declared is dependent on the number of time slots chosen for the graphic component of the individual planning (HOR sizing activity code). Also the descriptions of time slots is managed in local menu 811.
Warehousing is supplied as standard with 4 time slots (HOR = 4, local menu no. 811 = "Morning", "Noon", "Afternoon" and "Evening").
Principle to enter time slots in a given day:
Limit:
if a single time slot needs to be defined for a given work day (e.g. the whole day), it is not necessary to enter the time slot that should then remain blank. On the other hand, using a blank slot prevents another slot from being added to the same work day.
Close
Fields
The following fields are present on this tab :
|   |
|   |
|   |
|   |
|   |
|   |
| Specifies the activity code. |
Close