Refer to documentation Implementation
When a transaction is selected, the management of the tracking plans is done using the buttons at the bottom of the screen.
Fields
The following fields are present on this tab :
Filters
| The production site associated with the user is proposed by default. It can be modified by another site authorized for the operator, depending on its authorizations. |
| Operator in charge of performing the production planning or product ordering. |
| This field indicates the selection start date to enter. |
| This field indicates the selection end date to enter. |
Start - end range
| Entering these fields is not mandatory. Use them to limit the display of allocations to one document or a range of documents. |
| Enter the selection end entry number. |
| Enter the selection start routing. |
Enter the selection end routing. |
| Enter the start selection routing code. |
Enter the end selection routing code. |
|   |
| This field displays the work order number (unique ID). |
| This code is used to define the release mode.
Based on the entry transaction used, the partial modes can be of type "to be completed" or "final". |
| This field identifies the 1st day of the period for which the distribution key is defined. |
|   |
|   |
| Use this field to assign a priority to this work order. |
| This field indicates the product management unit in which are expressed:
This information is always displayed, regardless of the transaction used. It cannot be modified. |
| This field indicates the planned quantity, expressed in sales unit, for this contract product. |
|   |
| The routing is used to describe the product manufacturing process. |
| Multiple routings can be defined for a single product. Each routing code can be assigned specific management features. These include restriction of the routing to a specific site and to specific areas of functionality (for use in a manufacturing environment, for costing or for capacity planning). |
|   |
|   |
|   |
Close
Action icon
Close
This button is used to create a time tracking plan. |
This button is used to create a manufacturing plan. |
This button is used to create a material tracking plan. |
This button is used to create a reintegration plan. |
This button is used to create a technical sheet plan. |
This button is used to exclude all the available work order lines in the table. |