Manufacturing > Inquiries > List of WOs 

Use this function to display an overall plan of production at a specific site.

You can inquire on work orders at one, or a range of order statuses, component information and operation details.

Prerequisites

SEEREFERTTO Refer to documentation Implementation

Screen management

This function is customized to the needs of your organization and your processes. The Inquiry screens function for code 'MFG' determines the way in which you enter information, and how information is displayed and printed.

The List of WOs inquiry function contains a section for you to enter your selection criteria and a single tab in which the results of the search are displayed.

Header

Presentation

Selection

Use this section to define the production site, the status of the work orders and the date range. By default, the search is for all production at the defined site but can be changed to search within a range of dates.

Start - end range

Use this section to define the selection ranges to be used for filtering the results of the search.

Select components, Sel. operations

You can filter the results by one or a range of components and one or a range of expected or actual work centers using the Select components and Sel. operations sections. Component information or operation details can optionally be displayed.

You can apply Selection formulas to filter work orders for products, materials and operations.

You can use the Criteria action to enhance the selection criteria applied.

Close

 

Fields

The following fields are present on this tab :

Selection

Type in or select the production site from which the work orders are to be selected. This field is mandatory.

  • Order status (field MFGSTASTR)

Filter for results within a range of work order statuses. For a single work order status, enter the same status in the from/start Order status and to/end Order status fields.

  • Start date (field STRDATSTR)

Filter for results within a range of dates. For a single day, enter the same date in the Start date and End date fields. You can leave the Start date field blank to search all records to date.

  • End date (field ENDDATSTR)

 

Enter, select or build an Enterprise Management filter calculation expression using the formula editor.

 An error message is displayed if you refer to tables which are not generally used by the configurator, or to unknown variables.

Start - end range

  • Work order (field MFGNUMSTR)

Filter for results within a range of work orders. For a single work order, enter the same work order number in the from/start Work order and to/end Work order fields.

Filter for results within a range of finished products (BOMs). For a single bill of materials (BOM), enter the same product code in the from/start Released product and to/end Released product fields.

Use this field to filter the work orders to those for a specific bill of materials (BOM) code. Multiple bills of materials (BOMs) can be defined for a single product. Each BOM code can be assigned specific management features. For manufactured or subcontracted products this includes restriction of the BOM to a specific site and to specific areas of functionality (for costing or for capacity planning).

Filter for results within a range of routings. For a single route, enter the same routing code in the from/start Routing and to/end Routing fields.

Use this field to filter the work orders to those using a specific routing code. Multiple routings can be defined for a single product. Each routing code can be assigned specific management features. These include restriction of the routing to a specific site and to specific areas of functionality (for use in a manufacturing environment, for costing or for capacity planning).

Use these fields to filter for results within a range of project codes. For a single project, enter the same project code in the From/start project and To/end project fields. The content can be one of the following:

  • A project code
  • A project code and a project budget code
  • A project code and a project task code, that is a material task code, a labor task code (sales only), or a combined (mixed) labor and material task code.

If the content of this field includes a character such as an exclamation mark "!" this field links to the structure of the project. The character is the separator between a project code and the structure, either the project cost structure or the project operational structure. For example, if a material task code is 'USA-P3' and a project code is 'USA12345678', this field displays a link to the project operational structure as 'USA12345678!USA-P3'.

To provide a quick and easy visual reference the link to the project or project structure is distinguishable by the number of separator characters used. If there is no separator, the link is made to the project. A single separator character such as an exclamation mark after the project code (the first code) indicates the link type is a task (the link is to the project operational structure). Two separators placed after the project code mean that the link corresponds to a budget code (link to the project budget structure).

 This field is populated by default with the project code if you accessed this function directly from the project. If you accessed this function from the project structure the project code and project budget/task code is displayed accordingly.

  • Whole project (field PJTDSPALL)

Select this check box to view all records linked to the selected projects. To only view records linked to the selected structure of the projects, leave this check box clear.

If the value of the From/To project field includes a character such as an exclamation mark "!" the search includes the structure of the project. The character is the separator between a project code and the structure, either the project cost structure or the project operational structure. For example, if a material task code is "USA-P3" and a project code is "USA12345678", this field displays a link to the project operational structure as "USA12345678!USA-P3".

  • Original document (field VCRORISTR)

Filter for results within a range of source documents. For a single source document, enter the same document reference in the from/start Original document and to/end Original document fields.

Select components

Filter for results within a range of components. For a single component, enter the same component code in the from/start Component and to/end Component fields.

Enter, select or build an Enterprise Management filter calculation expression using the formula editor.

 An error message is displayed if you refer to tables which are not generally used by the configurator, or to unknown variables.

  • Materials detail (field MFMFLG)

Click this check box to display component information for each work order selected.

 You can choose to display component information or operation details, but not both.

Sel. operations

  • Expected W/C (field EXTWSTSTR)

Filter for results within a range of planned work centers. For a single work center, enter the same work center code in the from/start Expected W/C and to/end Expected W/C fields.

  • Actual work center (field CPLWSTSTR)

Filter for results within a range of actual work centers. For a single work center, enter the same work center code in the from/start Actual work center and to/end Actual work center fields.

Enter, select or build an Enterprise Management filter calculation expression using the formula editor.

 An error message is displayed if you refer to tables which are not generally used by the configurator, or to unknown variables.

  • Operations detail (field MFOFLG)

Click this check box to display operation details for each work order selected.

 You can choose to display component information or operation details, but not both.

Close

 

Tab Productions

Presentation

This tab displays all work order production at the specified site that meets the defined selection criteria. The product to be manufactured and status of each work order is included.

If component or operation detail has been requested, key component or operation detail is displayed dynamically including the current component or operation situation.

Color management provides a quick and easy indication of the status of each work order listed.

The columns displayed in the grid or table and the order in which they are displayed is determined by the Inquiry screens function for code 'MFG'.

Close

 

Fields

The following fields are present on this tab :

Grid

  • No. W.O. (field MFGNUM)

This field displays the work order number.

  • Status (field MFGSTA)

This field indicates the status of the work order. This status can be 'Firm', 'Planned' or 'Closed'.

This product code describes what is referred to as a "Bill of Materials" or a "BOM". A BOM contains structured information for making and costing a product. It defines the components that make up a product, and given this, the cost of the product.

The BOM code matches the product code.

  • Product description (field ITMDES1)

This is the description from the product record.

  • Major version (field ECCVALMAJ)

This field indicates which version of this product applies. Major versions might be used where there have been increased or significant changes to the original or previous version, that is the "form, fit or function" has changed.

This field is not populated if the product code defined in the Product field is not version managed.

   
  • Minor version (field ECCVALMIN)

This field indicates which minor version of this product applies. Minor versions might be used where there have been minor features or changes in functionality, or significant fixes applied to a specific major version.

This field is not populated if the product code defined in the Product field is not version managed.

  • WO line (field MFGLIN)

This field displays the line number of the released product.

The production site from which the work orders are to be processed.

This field displays the unit in which the product is stored. It provides the key to prices, costs, volumes etc.

  • Planned quantity (field EXTQTY)

This field displays the planned quantity. The quantity is expressed in the stock unit.

  • Actual accepted qty (field CPLQTY)

This field contains the quantity of the product to be released, expressed in the stock unit.

  • Lot (field LOT)

This is the lot to be assigned to the released product, based on the product management mode.

If the product is managed with automatic lot numbers, the lot number is assigned by the system when the work order is created.

  • Allocation date (field IPTDAT)

This field displays the date the stock was allocated to this work order line.

This field displays the release unit of measure (volume or mass) for this product for this order. This unit and any applicable unit conversion are defined for this product on the product record.

  • STK conversion (field UOMSTUCOE)

This field displays the product-specific conversion factor applied between the stock unit and the release unit of measure. This unit conversion is defined for this product on the product record.

This routing code describes a particular sequence of shop floor processes for a particular product. That is, the sequence of operations and tools that are used in a particular routing.

The routing code is a product code which can be the reference for a manufactured product or a generic reference (parent routing) linked to multiple products.

Multiple routings can be defined for a single product. Each routing code can be assigned specific management features. These include restriction of the routing to a specific site and to specific areas of functionality (for use in a manufacturing environment, for costing or for capacity planning).

Multiple bills of materials (BOMs) can be defined for a single product. Each BOM code can be assigned specific management features. For manufactured or subcontracted products this includes restriction of the BOM to a specific site and to specific areas of functionality (for costing or for capacity planning).

This field displays the associated project code. The content can be one of the following:

  • A project code
  • A project code and a project budget code
  • A project code and a project task code, that is a material task code, a labor task code (sales only), or a combined (mixed) labor and material task code.

If the content of this field includes a character such as an exclamation mark "!" this field links to the structure of the project. The character is the separator between a project code and the structure, either the project cost structure or the project operational structure. For example, if a material task code is 'USA-P3' and a project code is 'USA12345678', this field displays a link to the project operational structure as 'USA12345678!USA-P3'.

To provide a quick and easy visual reference the link to the project or project structure is distinguishable by the number of separator characters used. If there is no separator, the link is made to the project. A single separator character such as an exclamation mark after the project code (the first code) indicates the link type is a task (the link is to the project operational structure). Two separators placed after the project code mean that the link corresponds to a budget code (link to the project budget structure).

  • Source document type (field VCRTYPORI)

This field identifies the reason for the work order.

  • Source document (field VCRNUMORI)

This field identifies the number of the source document or order.

  • Start date (field STRDAT)

This field identifies the planned or actual production start date of the work order.

  • End date (field ENDDAT)

This field identifies the end or required completion date for this work order.

  • Allocation status (field ALLSTA)

The Allocation (materials), Scheduling and Status fields display a status for this work order. These fields are updated automatically by the system.

The current status, or progress of this work order is displayed in the Scheduling and Status fields. Selected combinations to note are as follows:

  • 'Not scheduled' and 'Pending'. The work order is awaiting scheduling. It cannot be submitted for scheduling in Production Scheduler, Sage X3 Web Scheduling or in any web scheduling solution developed by an ISV (independent software vendor).
  • 'Scheduled' and 'Pending'. The work order is scheduled but has not actually been submitted for scheduling.
  • 'Scheduled' and 'Being optimized'. The work order is being scheduled (has been submitted for scheduling). At these statuses you cannot modify the work order.
  • 'Optimized' and 'Pending'. The work order operations have been optimized by the scheduler.

The work order allocation values are defined in Local menu 336.
The scheduling status values are defined in Local menu 335.
The work order status values are defined in Local menu 339.

 For detailed scheduling, Activity code POPS activates the Production Scheduler functionality or the Generic finite scheduler interface.

 Production Scheduler only applies to on-premises instances of Sage X3. The Generic finite scheduler interface provides an integration connector to any web scheduling solution for either cloud or on-premises solutions.

  • Scheduling status (field SCDFLG)

The Allocation (materials), Scheduling and Status fields display a status for this work order. These fields are updated automatically by the system.

The current status, or progress of this work order is displayed in the Scheduling and Status fields. Selected combinations to note are as follows:

  • 'Not scheduled' and 'Pending'. The work order is awaiting scheduling. It cannot be submitted for scheduling in Production Scheduler, Sage X3 Web Scheduling or in any web scheduling solution developed by an ISV (independent software vendor).
  • 'Scheduled' and 'Pending'. The work order is scheduled but has not actually been submitted for scheduling.
  • 'Scheduled' and 'Being optimized'. The work order is being scheduled (has been submitted for scheduling). At these statuses you cannot modify the work order.
  • 'Optimized' and 'Pending'. The work order operations have been optimized by the scheduler.

The work order allocation values are defined in Local menu 336.
The scheduling status values are defined in Local menu 335.
The work order status values are defined in Local menu 339.

 For detailed scheduling, Activity code POPS activates the Production Scheduler functionality or the Generic finite scheduler interface.

 Production Scheduler only applies to on-premises instances of Sage X3. The Generic finite scheduler interface provides an integration connector to any web scheduling solution for either cloud or on-premises solutions.

  • WO status (field MFGTRKFLG)

 

  • Operation (field OPENUM)

This field displays the sequence number of this operation.

  • Expected W/C (field EXTWST)

This field identifies the production resource that is to be used for this operation.

  • Planned work center title (field EXTWSTDES)

The description of the work center.

  • Actual work center (field CPLWST)

This field identifies the production resource used for this operation.

  • Actual work center title (field CPLWSTDES)

The description of the work center.

  • Expected labor work center (field EXTLAB)

This field identifies the labor work center that is to be associated with this machine. For example, the labor work center that relates to the crew that operates this machine.

The work center site of a 'labor' work center must match the site for the routing code, if defined.

Scheduling is not carried out for labor work centers as they are considered secondary and 'always available' (or available at the same time as the main work center). Their load is managed for information purposes only using the coefficients defined for the main work center.

If the main work center is of type 'subcontracting' there is no associated secondary work center.

  • Planned labor w c title (field EXTLABDES)

The description of the work center.

  • Actual labor work center (field CPLLAB)

This field identifies the labor work center assigned to this machine. For example, the labor work center that relates to the crew that operates this machine.

The work center site of a 'labor' work center must match the site for the routing code, if defined.

Scheduling is not carried out for labor work centers as they are considered secondary and 'always available' (or available at the same time as the main work center). Their load is managed for information purposes only using the coefficients defined for the main work center.

If the main work center is of type 'subcontracting' there is no associated secondary work center.

  • Actual labor w c title (field CPLLABDES)

The description of the work center.

  • Operation situation (field MFOTRKFLG)

This field tracks the progress and status of this operation.

Component product reference.

  • Component (field CPNITMDES1)

This is the description from the product record.

  • BOM sequence (field BOMSEQ)

This field identifies the sequence number of this component in the BOM (bill of materials).

  • Material situation (field MFMTRKFLG)

This field tracks the progress and status of this component.

Close

 

Action icon

Stock by site

Click Stock by site from the Actions icon to view the inventory levels for the selected product, by site.

Work order

Click Work order from the Actions icon to view the work order details. The transaction you select determines the way in which you enter information, and how information is displayed and printed. If only one transaction has been set up you are not offered a choice, the default entry screen is displayed.

 

Close

 

Specific actions

Click the Search action to load the table (grid) with work order production lines that meet the entered selection criteria.

The maximum number of lines displayed is defined in the Inquiry screens function for code 'MFG'.

The following fields are included on the window opened through this button :

Selection criteria

  • Memo code (field MEMO)

You use a memo code to save the criteria applied to an entry screen. Use this field to find out if a memo code has already been saved for the current screen values.

Use the following buttons to manage memos:

Recall: Recall a previously defined and saved memo.

Memo: Save the current values of the screen in a memo file with a code to be specified.

Del. Memo: Delete a previously saved memo.

If a memo named STD (standard) is associated with the screen, it is loaded when opening the function.

Type in or select the production site from which the work orders are to be selected. This field is mandatory.

Start - end range

  • Order status (field MFGSTASTR)

Filter for results within a range of work order statuses. For a single work order status, enter the same status in the from/start Order status and to/end Order status fields.

  • Work order (field MFGNUMSTR)

Filter for results within a range of work orders. For a single work order, enter the same work order number in the from/start Work order and to/end Work order fields.

Filter for results within a range of bills of materials (BOMs). For a single bill of materials (BOM), enter the same product code in the from/start parent Product and to/end Product fields.

Use this field to filter the work orders to those for a specific bill of materials (BOM) code. Multiple bills of materials (BOMs) can be defined for a single product. Each BOM code can be assigned specific management features. For manufactured or subcontracted products this includes restriction of the BOM to a specific site and to specific areas of functionality (for costing or for capacity planning).

Filter for results within a range of routings. For a single route, enter the same routing code in the from/start Routing and to/end Routing fields.

Use this field to filter the work orders to those using a specific routing code. Multiple routings can be defined for a single product. Each routing code can be assigned specific management features. These include restriction of the routing to a specific site and to specific areas of functionality (for use in a manufacturing environment, for costing or for capacity planning).

Use these fields to filter for results within a range of project codes. For a single project, enter the same project code in the From/start project and To/end project fields. The content can be one of the following:

  • A project code
  • A project code and a project budget code
  • A project code and a project task code, that is a material task code, a labor task code (sales only), or a combined (mixed) labor and material task code.

If the content of this field includes a character such as an exclamation mark "!" this field links to the structure of the project. The character is the separator between a project code and the structure, either the project cost structure or the project operational structure. For example, if a material task code is 'USA-P3' and a project code is 'USA12345678', this field displays a link to the project operational structure as 'USA12345678!USA-P3'.

To provide a quick and easy visual reference the link to the project or project structure is distinguishable by the number of separator characters used. If there is no separator, the link is made to the project. A single separator character such as an exclamation mark after the project code (the first code) indicates the link type is a task (the link is to the project operational structure). Two separators placed after the project code mean that the link corresponds to a budget code (link to the project budget structure).

 This field is populated by default with the project code if you accessed this function directly from the project. If you accessed this function from the project structure the project code and project budget/task code is displayed accordingly.

  • Whole project (field PJTDSPALL)

Select this check box to view all records linked to the selected projects. To only view records linked to the selected structure of the projects, leave this check box clear.

If the value of the From/To project field includes a character such as an exclamation mark "!" the search includes the structure of the project. The character is the separator between a project code and the structure, either the project cost structure or the project operational structure. For example, if a material task code is "USA-P3" and a project code is "USA12345678", this field displays a link to the project operational structure as "USA12345678!USA-P3".

  • Source document type (field VCRTYP)

Use this field to filter the results of the inquiry to a specific type of source (original) document.

  • Original document (field VCRORISTR)

Filter for results within a range of source documents. For a single source document, enter the same document reference in the from/start Original document and to/end Original document fields.

  • Start date (field STRDATSTR)

Filter for results within a range of dates. For a single day, enter the same date in the Start date and End date fields. You can leave the Start date field blank to search all records to date.

  • End date (field ENDDATSTR)

 

  • WO status (field MTKFLGSTR)

Filter for results within a range of work order statuses. For a single work order status, enter the same status in the from/start WO status and to/end WO status fields.

Enter, select or build an Enterprise Management filter calculation expression using the formula editor.

 An error message is displayed if you refer to tables which are not generally used by the configurator, or to unknown variables.

Select components

Filter for results within a range of components. For a single component, enter the same component code in the from/start Component and to/end Component fields.

Enter, select or build an Enterprise Management filter calculation expression using the formula editor.

 An error message is displayed if you refer to tables which are not generally used by the configurator, or to unknown variables.

  • Materials detail (field MFMFLG)

Click this check box to display component information for each work order selected.

 You can choose to display component information or operation details, but not both.

Sel. operations

  • Expected W/C (field EXTWSTSTR)

Filter for results within a range of planned work centers. For a single work center, enter the same work center code in the from/start Expected W/C and to/end Expected W/C fields.

  • Actual work center (field CPLWSTSTR)

Filter for results within a range of actual work centers. For a single work center, enter the same work center code in the from/start Actual work center and to/end Actual work center fields.

Enter, select or build an Enterprise Management filter calculation expression using the formula editor.

 An error message is displayed if you refer to tables which are not generally used by the configurator, or to unknown variables.

  • Operations detail (field MFOFLG)

Click this check box to display operation details for each work order selected.

 You can choose to display component information or operation details, but not both.

Display

The columns displayed in the search results grid or table, the order in which they are displayed and the layout of the associated graph is determined by a screen code. Use this field to apply a specific screen display code to the search results. Type in or select a code defined in the Inquiry screens function for this particular inquiry function.

 The standard screen code defined for this function (typically code 'STD') is used if you leave this field blank.

  • Selection (field TRI)

Use this field to modify the sort order.

Close

Click the Criteria action to access additional selection and display criteria. You can filter the work order and work order lines to be produced by the original (source) document type and modify the sort order.

Screen code. You can select the required customized inquiry screen, if you are using personalized inquiries.

 Please see the Inquiry screens documentation.

You can save one or several sets of criteria using the Memoaction. You can recall these using the Recallaction or delete them using the Delete memo action.

Error messages

The only error messages are the generic ones.

Tables used

SEEREFERTTO Refer to documentation Implementation