Projects > Time management > Time entry 

Use this function to enter labor time on a day-by-day basis.

You can use this function either independently, or in conjunction with the Weekly timesheet function (PJMTEW).

If you are entering your own time you can enter labor time against your projects, against specific task operations and budget codes, as well as against non-project activities such as training or annual leave.

If you are authorized as a time entry administrator you can enter labor time for any employee.

Entry, approval, and posting of labor time occurs in separate individual stages. An optional stage is available to your organization if they require it. This additional stage is called a "control" phase. It is essentially the opportunity for one time entry administrator to review a validated time entry record before a different time entry administrator approves it. With a control phase in place the processing cycle of a time entry record is as follows:

  • Entry: Labor time is entered, then validated.
    Entry and validation takes place in this function (PJMTE) or in the Weekly timesheet function (PJMTEW).
    Entry, and validation that the time entered is correct is usually made by the employee themselves, by the user that entered the time entry record, or by a time entry administrator.
    Each new time entry record is created at Validated status if the PJMTIMAUTO - Time entry auto. validation parameter (TC chapter, PJM group) is set to Yes.
  • Control: All validated time entry records must be "controlled" before they can be approved if the PJMTIMENT - Time entry control phase parameter (TC chapter, PJM group) is set to Mandatory.
    The "control" phase takes place in the Time approval function (PTEVAL).
    Time entry record control is usually carried out by a project manager or a project administrator. Whatever the role of the manager or administrator they must be authorized as such in their function profile, as defined in their user record.
  • Approval: Validated and controlled (optional phase) time entry records are approved or rejected.
    Approval or rejection of a validated and controlled time entry record takes place in the Time approval function (PTEVAL), again usually by a project manager or a project administrator.
    • Time entry records must be approved before they can be posted.
    • A time entry record cannot be changed once it has been controlled.
    • Rejected time entry records are redisplayed in this function and in the Weekly timesheet function for correction.
  • Posting: When a time entry record is posted it is included as a cost against a project in the accounting module.
    The posting of an approved time entry record takes place in the Time posting function (PTELABPOS).

 All time entry records must first be validated then controlled (mandatory if the PJMTIMENT parameter is set) before they can be approved then posted.

Prerequisites

SEEREFERTTO Refer to documentation Implementation

Screen management

The Time entry function contains a home section for you to enter your selection criteria, 2 sections for you to enter labor time spent, and 2 reference sections:

  • Time summary. Use this section to enter labor time spent, by date.
  • Assignments. Use this section to enter labor time spent, by date against the list of operations you or this employee are assigned to for the filtered projects.
  • Analytical dimension. This section displays the analytical dimension types associated with the selected time entry line.
  • Activity template selection. Use this section to select predefined activities to add to your timesheet.

Header

Presentation

Use this section to filter, or select your employee time records:

  • Start/End date. To enter labor time against projects and specific operations for a single day, enter the same date in the Start date and End date fields. You can leave the Start date field blank to search all records to date.
  • Project. Type in or select a specific project code, or leave blank to include all projects assigned to you, or this employee.

You can filter the results by the status of the project, and/or time entry records using the XX only check boxes.

The Start/End date fields also filter lines in the Activity template selection section to template activities defined without dates, and activities with dates that match the entered dates.

Close

 

Fields

The following fields are present on this tab :

Block number 3

Block number 1

Type in or select your user code.

If you are authorized to record time for all employees, type in or select the user code you want to record time for.

 If you are recording your own time, your user record must be enabled to permit you to do this. That is, the Time entry check box on youruser record must be selected; if you are recording labor time for other users, the Time entry check box on their user record must be selected and your user record must be defined as an administrator user. That is, the Time entry administrator check box on your user record must be selected.

  • Start date (field TSDATE)

Filter for results within a range of dates. For a single day, enter the same date in the Start date and End date fields. You can leave the Start date field blank to search all records to date.

Use this field to filter the parent (or source) project codes to which you, or the defined employee are assigned. Type in or select a specific project code or to include all project codes, leave blank.

  • Active projects only (field ISOPEN)

Select this check box to filter the results to only active project codes, otherwise leave clear. Active project codes are those projects at Launched or Delivered status.

Only employees defined as active on projects can be assigned to tasks. The user is activated using their user record.

  • Assigned projects only (field ASSIGNED)

Select this check box to filter the results to only those project codes to which this employee is assigned, otherwise leave clear.

  • Non validated only (field STAVAL)

Select this check box to filter the results to only those time entry records for this employee at Awaiting validation status, otherwise leave clear.

  • Rejected only (field STAREJ)

Select this check box to filter the results to only those time entry records for this employee at Rejected status, otherwise leave clear.

Rejected time entry lines are redisplayed in this function for correction.

Summary

  • Today (field TODAY)

This field displays the total combined project and non-project labor time entered for this employee today, according to the defined selection filters.

  • Weekly (field TWEEK)

This field displays the total combined project and non-project labor time entered for this employee this week, according to the defined selection filters.

  • Monthly (field PTEMON)

This field displays the total combined project and non-project labor time entered for this employee this month, according to the defined selection filters.

  • Total (field PTETOT)

This field displays the total cumulative labor time entered for this employee, according to the defined selection filters.

 If the filters are changed, each of these summary figures is updated accordingly.

This field displays the time unit as specified on the task operation on the project.

Close

 

Tab Time summary

Presentation

This section displays the time spent, by date, according to the defined selection filters. Use this section to enter labor time for a project, a task, an operation, for a specific budget code, and for non-project activities such as training or annual leave. Each time entry line for a project provides expense information which is used to calculate the rate to be charged to the project.

You can use the PJMTIMBUD - Allow time entries on budgets and PJMTIMTAS - Allow time entries on tasks parameters (TC chapter, PJM group) to control mandatory or optional recording of time against task operations and budget codes.

 "Rejected" time entry lines are displayed for correction. Controlled, approved and posted time entry lines are not displayed.

 A "control phase" for approving validated time entry lines applies if the PJMTIMENT - Time entry control phase parameter (TC chapter, PJM group) is set to Mandatory. Only when a time entry line is at Controlled status can it then be advanced to Approved status and posted against a project.

Close

 

Fields

The following fields are present on this tab :

Block number 2

Grid

  • Desc (field BTBLIG)

To provide a free-format narrative description and/or comment for this record, click the Edit icon. This opens a screen in which you can add a clear, supporting description for this record with comments in a separate field. Any comments should be specific to this record. They should do more than just "describe" the record.

  • Date (field PTEDAT)

Use this field to select the date you want to enter labor time for.

Use this field to assign this labor time to a specific time category such as overtime or double time.

The time category code is displayed if this is a new time entry line and a time category is defined on the employee's user record or the project. You can change it if necessary.

You can only assign a non-project category such as sick leave or annual leave when the Project field (OPPNUMSCR) is blank.

Time categories for a project can be defined on budget codes, task codes, task operations, and on employee assignment lines.

Use this field to define the code of a particular project or job your company is working on that you want to record labor time against.

  • Task (field TASCODSCR)

Use this field to define the specific task code to record labor time against. Each task code corresponds with an operational phase of a project.

 You can leave this field blank if the PJMTIMBUD-Allow time entries on budgets parameter (TC chapter, PJM group) is set to Yes.

  • Operation (field OPENUM)

Use this field to define the specific task operation sequence number to record labor time against.

 This field is mandatory if the Task code field (TASCOD) is populated and the PJMTIMTAS - Allow time entries on tasks parameter (TC chapter, PJM group) is set to No. You can leave this field blank if the PJMTIMTAS - Allow time entries on tasks parameter is set to Yes.

  • Budget (field PBUCODSCR)

Use this field to define a specific budget code to record labor time against. Each budget code represents a financial phase of a project. This field is mandatory.

This field displays the time unit as specified on the task operation on the project, but can be amended.

  • Time spent (field PTEQTY)

Use this field to enter in the defined time unit, the amount of labor time you or this employee spent working on the project, on the task, on the operation, on the specific budget code, or on a non-project activity such as training or annual leave.

  • Description (field PTEDESAXX)

This field displays the description of the task, the operation, or the specific budget code defined on the project, or the non-project activity. You can change this description to make this activity more meaningful to you.

  • Validated (field PTEVAL)

This check box is initially controlled by the PJMTIMAUTO - Time entry auto. validation parameter (TC chapter, PJM group):

  • If PJMTIMAUTO is set to No this check box is clear.
    If you have entered this time entry line and it is complete and correct, select this check box. This validates this line.
    If you are a time entry administrator validating time entry records for other employees and this time entry line is complete and correct, select this check box.
  • If PJMTIMAUTO is set to Yes this time entry line has been created at Validated status.
    If there is an issue with this time entry line, clear this check box. This will change the status of this line to Awaiting validation. When the details are correct and confirmed this time entry line can be revalidated manually either by this employee or user that entered the time entry record, or by a time entry administrator.

 You must be an authorized time entry administrator to change this check box for an employee other than yourself, that is, the Time entry administrator check box on your user record must be selected and your assigned Function profile must be authorized for function PTEVAL (Time approval) with option 4.

 A "control phase" for approving validated time entry lines applies if the PJMTIMENT - Time entry control phase parameter (TC chapter, PJM group) is set to Mandatory.

    • Billable (field BILLABLE)

     

    • Status (field PTESTA)

    This field displays the current work in progress status of this time entry line, as follows:

    • Validated, if this time entry line has been created at Validated status (the PJMTIMAUTO - Time entry auto. validation parameter (TC chapter, PJM group) is set to Yes), or is complete and has been manually validated either by yourself or by a time entry administrator.
    • Awaiting validation, if this is a new time entry line (PJMTIMAUTO is set to No), or this line has been devalidated, corrected and is currently awaiting validation.

    • Billable from (field BILFRO)

     

    • Planned load (field STDQTY)

    This field displays the total time planned or estimated for this task operation for this project. The quantity is expressed in the time unit.

    • Consumed load (field CSMQTY)

    This field displays the total time consumed by all employees (the aggregated time) against this task or task operation. The quantity is expressed in the time unit.

    • Remaining load (field RMNQTY)

    This field displays the total remaining time (planned time - consumed time) to be consumed against this task or task operation. The quantity is expressed in the time unit.

    This field displays the time unit as specified on the task operation on the project.

    This field displays the site from which this project is managed.

    This field displays the project cost type against which this labor time will be recorded. You can change the default code.

    • For project-related activities, the Project cost type code is determined as follows:
      • If a link with a work center is established, the cost type defined on the operation resource (work center record) is displayed.
      • If a link is established at the task category level, the cost type defined on the task category is displayed.
      • If a link with a work center or task category fails, the link is established at the user level and the cost type defined on the user record is displayed.
      • If the system fails to obtain a linked cost type code, the cost type defined in the PCCCOD - Default labor cost type parameter (TC chapter, PJM group) is displayed.
    • For non-project activities such as training or annual leave, the cost type code is determined as follows:
      • If a link with a time category is established, the cost type defined on the time category record is displayed.
      • If a link with a time category fails, the link is established at the user level and the cost type defined on the user record is displayed.
      • If a link with a time category and the user record fails, this field is left blank.

       Project cost types define types of cost that can affect a project such as raw materials, labor costs and indirect costs.

       The Financial overview function (PJMFINOV0) uses this cost type to calculate actuals.

    This field displays the employee cost type against which this labor time will be recorded. The cost type code is determined by the cost type defined on your or this employee's user record but can be amended.

    • For project-related activities, if your user cost type is blank the Employee cost type code is determined as follows:
      • The Project cost type is displayed.
      • If your user cost type is blank and the Project cost type is blank, the cost type defined in the PCCCOD - Default labor cost type parameter (TC chapter, PJM group) is displayed.
    • For non-project activities such as training or annual leave, if your user cost type is blank the cost type code is determined as follows:
      • The cost type defined on the time category record is displayed.
      • If your user cost type is blank and the time category cost type is blank, this field is left blank.

     Project cost types define types of cost that can affect a project such as labor costs.

    • Project labor rate (field PJMCST)

    This field displays the labor rate at which time is charged to this project for this time entry line. You can change the default rate.

    • For project-related activities, the labor rate is determined by the value of the PJMCSTLAB - Project labor rate priority parameter (TC chapter, PJM group), as follows:
      • If set to Employee, the labor rate defined on your or this employee's user record is displayed.
      • If set to Project cost type, the labor rate defined on the project cost type record is displayed.
    • For non-project activities such as training or annual leave, the labor rate is determined as follows:
      • The labor rate defined on the cost type record linked to the time category is displayed.
      • If there is no link with the time category, the labor rate defined on your or this employee's user record is displayed.
      • If a link with the time category and the user record fails, this field is left blank.

    • Employee labor rate (field CLBCST)

    This field displays the rate at which this labor time is charged to this project for this time entry line. You can change the default rate.

    • For project-related activities, the rate is determined by the value of the PJMCST - Employee labor rate priority parameter (TC chapter, PJM group), as follows:
      • If set to Employee, the hourly rate defined on your or this employee's user record is displayed.
      • If set to Project cost type, the labor rate defined on the project cost type record is displayed.
    • For non-project activities such as training or annual leave, the rate is determined as follows:
      • The hourly rate defined on your or this employee's user record is displayed.
      • If a link with the user record fails, the labor rate defined on the cost type record linked to the time category is displayed.
      • If a link with the user record and the time category fails, this field is left blank.

     The financial overviews use this rate to consolidate time entry expenses.

    • Rate multiplier (field PTETYPRAT)

    This field displays the factor by which the labor rates defined in the Project labor rate (PJMCST) and Employee labor rate (CLBCST) fields for this time entry will be multiplied. It is determined by the value of the Time category field (PTETYP). For example, it will display "1" if the time category is blank as this equates to standard working time, or "2" if the defined time category equates to a rate to be paid at double standard working time. If set to "0" (zero) this time entry record will be valued at zero.

    This rate multiplier is used in the Financial overview function (PJMFINOV0) (cost calculation) and in the Time posting function (PTELABPOS) to calculate the value of the associated journal entry line. The amount posted will be calculated using the appropriate formula:

    • Time spent (PTEQTY field) x Project labor rate (PJMCST field) x Rate multiplier (PTETYPRAT field)
    • Time spent (PTEQTY field) x Employee labor rate (CLBCST field) x Rate multiplier (PTETYPRAT field).

     If the time category equates to a zero rate, this will result in the amount of time recorded in the Time spent field being recorded against the defined project but the value of that labor time will be zero.​

    This field defaults to the currency associated with the sales site (Sales site field) defined for the project. It cannot be changed once the project has been created.

    This field displays the code of the user that created or entered this record.

    This field displays the code of the last user to modify this record.

    This field displays the code of the user that validated this record.

    This field, if populated, displays the code of the user that formally rejected this record.

     

    • Time entry line number (field PTESEQ)

     

    Close

     

    Action icon

    Remaining load update

    Fields

    The following fields are included in this window :

    Technical

    Operation load

    This field displays the code of the particular project or job this task operation applies to.

    • Task code (field TASCOD)

    This field displays the task code your, or the defined employee's labor time will be recorded against.

    • Operation (field OPENUM)

    This field displays the specific task operation sequence number against which your, or this employee's labor time will be recorded.

    • Planned load (field EXTQTY)

    This field displays the total time planned or estimated for this task operation for this project. The quantity is expressed in the time unit.

    • Consumed load (field CSMQTY)

    This field displays the total time consumed by all employees (the aggregated time) against this task or task operation. The quantity is expressed in the time unit.

    • Remaining load (field RMNQTY)

    This field displays the total remaining time (planned time - consumed time) to be consumed against this project operational task. The quantity is expressed in the time unit. You can change this figure if necessary.

     The cumulative planned and remaining load figures, that is for all employees, must match or be less than those defined for the operational task line.

    This field displays the time unit as specified on the task operation on the project.

    Close


    Click Remaining load update from the Actions icon to change the remaining workload figure (for launched tasks) for this project operational task. This ensures the project can provide real time estimates on this individual operation's workload.

     The cumulative planned and remaining load quantities, that is for all employees, must match, or be less than those defined for the operational task line.

    Currency rate

    Click Currency rate from the Actions icon to view or change the exchange rate applied to this line.

     

    Close

     

    Tab Assignments

    Presentation

    This section displays the list of operations to which you or the defined employee are assigned for the projects selected from the selection criteria entered in the home section. Use this section instead of, or in conjunction with the Time summary section to enter labor time.

     

    Fields

    The following fields are present on this tab :

    Block number 2

    Grid

    • Desc (field BTLIGAFF)

    To provide a free-format narrative description and/or comment for this record, click the Edit icon. This opens a screen in which you can add a clear, supporting description for this record with comments in a separate field. Any comments should be specific to this record. They should do more than just "describe" the record.

    • Date (field PTEDAT)

    Use this field to select the date you want to record labor time for. The default is today's date.

    • Time spent (field PTEQTY)

    Use this field to enter time spent against the displayed task operation on the defined date.

    This field displays the time unit as specified on the task operation on the project, but can be amended.

    • Start date (field POASTR)

    This field displays the date from which you, or the defined employee were assigned to work on this task operation.

    • Start time (field POASTRHM)

    This field displays the time you, or the defined employee should have started working on this task operation.

    • End date (field POAEND)

    This field displays the last date you, or the defined employee were assigned to work on this task operation.

    • End time (field POAENDHM)

    This field displays the time you, or the defined employee should have finished working on this task operation.

    • Operation (field OPENUM)

    This field displays the specific task operation sequence number against which your, or this employee's labor time will be recorded.

    • Description (field PTEDESAXX)

    This field displays the description of the task, the operation, or the specific budget code defined on the project, or the non-project activity. You can change this description to make this activity more meaningful to you.

    This field displays the code of the particular project or job this task operation applies to.

    • Task code (field TASCOD)

    This field displays the task code your, or the defined employee's labor time will be recorded against.

    Use this field to assign this labor time to a specific time category such as overtime or double time.

    The time category code is displayed if this is a new time entry line and a time category is defined on the employee's user record or the project. You can change it if necessary.

    You can only assign a non-project category such as sick leave or annual leave when the Project field (OPPNUMSCR) is blank.

    Time categories for a project can be defined on budget codes, task codes, task operations, and on employee assignment lines.

    • Billable (field BILLABLE)

     

    • Billable from (field BILFRO)

     

    • Planned load (field STDQTY)

    This field displays the total time planned or estimated for this task operation for this project. The quantity is expressed in the time unit.

    • Consumed load (field CSMQTY)

    This field displays the total time consumed by all employees (the aggregated time) against this task or task operation. The quantity is expressed in the time unit.

    • Remaining load (field RMNQTY)

    This field displays the total remaining time (planned time - consumed time) to be consumed against this task or task operation. The quantity is expressed in the time unit.

    This field displays the time unit as specified on the task operation on the project.

    This field displays the site from which this project is managed.

    • Budget code (field PBUCOD)

    This field displays the specific budget code your, or the defined employee's labor time will be recorded against. Each budget code represents a financial phase of a project.

    • Rate multiplier (field PTETYPRAT)

    This field displays the factor by which the labor rates defined in the Project labor rate (PJMCST) and Employee labor rate (CLBCST) fields for this time entry will be multiplied. It is determined by the value of the Time category field (PTETYP). For example, it will display "1" if the time category is blank as this equates to standard working time, or "2" if the defined time category equates to a rate to be paid at double standard working time. If set to "0" (zero) this time entry record will be valued at zero.

    This rate multiplier is used in the Financial overview function (PJMFINOV0) (cost calculation) and in the Time posting function (PTELABPOS) to calculate the value of the associated journal entry line. The amount posted will be calculated using the appropriate formula:

    • Time spent (PTEQTY field) x Project labor rate (PJMCST field) x Rate multiplier (PTETYPRAT field)
    • Time spent (PTEQTY field) x Employee labor rate (CLBCST field) x Rate multiplier (PTETYPRAT field).

     If the time category equates to a zero rate, this will result in the amount of time recorded in the Time spent field being recorded against the defined project but the value of that labor time will be zero.​

     

    Action icon

    Remaining load update

    Fields

    The following fields are included in this window :

    Technical

    Operation load

    This field displays the code of the particular project or job this task operation applies to.

    • Task code (field TASCOD)

    This field displays the task code your, or the defined employee's labor time will be recorded against.

    • Operation (field OPENUM)

    This field displays the specific task operation sequence number against which your, or this employee's labor time will be recorded.

    • Planned load (field EXTQTY)

    This field displays the total time planned or estimated for this task operation for this project. The quantity is expressed in the time unit.

    • Consumed load (field CSMQTY)

    This field displays the total time consumed by all employees (the aggregated time) against this task or task operation. The quantity is expressed in the time unit.

    • Remaining load (field RMNQTY)

    This field displays the total remaining time (planned time - consumed time) to be consumed against this project operational task. The quantity is expressed in the time unit. You can change this figure if necessary.

     The cumulative planned and remaining load figures, that is for all employees, must match or be less than those defined for the operational task line.

    This field displays the time unit as specified on the task operation on the project.

    Close


    Click Remaining load update from the Actions icon to change the remaining workload figure (for launched tasks) for this project operational task. This ensures the project can provide real time estimates on this individual operation's workload.

     The cumulative planned and remaining load quantities, that is for all employees, must match, or be less than those defined for the operational task line.

    Currency rate

    Click Currency rate from the Actions icon to view or change the exchange rate applied to this line.

     

    Close

     

    Tab Analytical dimension

    Presentation

    This section displays the analytical dimension types associated with the selected time entry line.

    Default dimension code PTE is supplied with your system to provide default dimension values for all new time entry lines. PTE is defined in the Default dimensions function (GESCDE).

    Close

     

    Fields

    The following fields are present on this tab :

    Block number 2

    Grid

    This table is loaded automatically with the default dimension types for the site of the selected time entry line.

    Type in or select a dimension code to assign to the associated dimension type.

     This field might display the dimension code suggested by the system (if various conditions were met) that has been created and assigned to the associated dimension type.

    Close

     

    Tab Activity template selection

    Presentation

    You use this section to select predefined activities to add to your timesheet.

    The template activities listed are filtered to those activities defined without dates, and activities with dates that match the dates defined in the home section.

    Each activity you select in this section is added as a new line in your timesheet. An activity template line can be for a specific date, for a specific working day, or generic, that is the line provides a quick reference for you to add common activities to your time entry record as, and when required. A template line is just that, a basic outline of a timesheet activity. You can change most of the template fields once the line is displayed in the Time summary section.

    Tip: You can add a single template activity to your timesheet multiple times. Simply select the activity, clear the Select check box, then reselect the activity. Each time you select a line the template activity is added to your Time summary.

    Close

     

    Fields

    The following fields are present on this tab :

    Block number 2

    Grid

    • Select (field PTESEL)

    Select this check box to add this template line to your timesheet.

    • Date (field PTEDAT)

    This field displays the specific date this activity applies to. The prerecorded labor time will display in your timesheet for this date.

    • Day (field PTEDAY)

    This field displays the specific day of the week this activity applies to. The prerecorded labor time will display in your timesheet for this day.

    This field displays the specific time category this activity applies to, such as overtime, double time, travel time.

    This field displays the code of a particular project, or job your company is working on against which your, or this employee's labor time will be recorded.

    • Task (field TASCOD)

    This field displays a specific task code from the operational (task) structure of the parent project. Each task code corresponds with an operational phase of a project.

    • Operation (field OPENUM)

    This field displays the specific task operation sequence number your labor time will be recorded against.

     This field is mandatory if the Task code field (TASCOD) is populated and the PJMTIMTAS - Allow time entries on tasks parameter (TC chapter, PJM group) is set to No. You can leave this field blank if the PJMTIMTAS - Allow time entries on tasks parameter is set to Yes.

    • Budget (field PBUCOD)

    This field displays a specific budget code from the budget (cost) structure of the parent project. Each budget code represents a financial phase of a project.

    • Description (field PTEDESAXX)

    This field displays the description of the task, the operation, or the specific budget code defined on the project, the description of the non-project activity, or the description you added to your template to make this activity more meaningful to you. You can change this description.

    This field displays the code in which your labor time for this activity is recorded.

    This field is mandatory if you have specified a Date or a Day for this activity.

    • Time spent (field PTEQTY)

    This field displays your labor time for the defined date, or day of the week.

    This field is mandatory if you have specified a Date or a Day for this line.

    • Origin (field PTEORI)

    This field indicates if time entered against this activity is entered manually, or imported using the PJMTIMACTI - Activity template import template.

    Close

     

    Specific actions

    Click the Search action to load the Time summary table with time entries that meet the entered selection criteria.

    Click the Time inquiry action to inquire on labor time you or the defined employee has entered for one, or between a range of dates. You can inquire by company and site, category of time and status of the time entry records for one, or a range of projects.

    Click the Time verification action to check that time entry records are up to date.

    The following fields are included on the window opened through this button :

    Block number 2

    Grid

    • Date (field PTEDAT)

    Use this field to select the date you want to enter labor time for.

    This field is optional. If you specify aDate you must leave theDay field blank; if you specify aDay you must leave theDate field blank.

    • Day (field PTEDAY)

    Use this field to select the day of the week you want to enter labor time for.

    This field is optional. If you specify aDate you must leave theDay field blank; if you specify aDay you must leave theDate field blank.

    Use this field to assign your labor time to a specific time category (for example, overtime, double time, travel time).

    Use this field to define the code of a particular project or job your company is working on that you want to record labor time against.

    • Task (field TASCOD)

    Use this field to define the specific task code to record labor time against. Each task code corresponds with an operational phase of a project.

    • Operation (field OPENUM)

    Use this field to define the specific task operation sequence number to record labor time against.

    • Budget (field PBUCOD)

    Use this field to define a specific budget code to record labor time against. Each budget code represents a financial phase of a project. This field is mandatory.

    • Description (field PTEDESAXX)

    This field displays the description of the task, the operation, or the specific budget code defined on the project, the description of the non-project activity, or the description you added to your template to make this activity more meaningful to you. You can change this description.

    Use this field to define the code in which labor time you enter against this activity is measured.

    This field is mandatory if you have specified a Date or a Day for this line.

    • Time spent (field PTEQTY)

    Use this field to record time against the defined date, or day of the week.

    This field is mandatory if you have specified a Date or a Day for this line.

    • Origin (field PTEORI)

    This field indicates if time entered against this activity is entered manually, or imported using the PJMTIMACTI - Activity template import template.

    Close

    Click the Activity template action to define or modify your own personal time entry activity template. You can use the template activities with both daily time entry records and with weekly time entries.

    Tip: Use activity templates to save you time and avoid errors if your project work is fairly consistent week on week, or you want a quick way to add non-project activities such as annual leave to your timesheet.

    Each line you define in your activity template can be for a specific date, for a specific working day, or generic, that is the line provides a quick reference for you to add common activities to your time entry record as, and when required.

    Error messages

    The only error messages are the generic ones.

    Tables used

    SEEREFERTTO Refer to documentation Implementation